Monopile Installation Using Jack-Up Platforms
12 februari 2026 van 18:00 tot 21:00
As monopiles grow in size and weight, their impact on jack-up platforms during installation becomes increasingly critical, particularly during the transition through the waterline.
GustoMSC has developed a representative model to assess these dynamic scenarios and ensure safe operations.
This lecture will provide an overview of monopile installation using jack-ups, focusing on the lowering phase, illustrated through a relevant case study.
Presenter: Joaquin Bilbao GustoMSC
Prior to the technical presentation, Marc Doorduin, Commercial Director, will provide an introductory overview of jack-up platforms and their role in offshore wind installation.
Details
* Until 10 February you can indicate with your registration if reserving snacks is necessary for you.
* After 10 February there may be a possibility to registrate -if not fully booked- but no snacks will be reserved for you. You will expected by 19:00h then.
* The number of parking spaces is limited and the location is easily accessible by public transport.